Mustang Trails Slope Stabilization

  Farmers Branch, Texas

Mustang Trails Slope Stabilization

View Next Project >>


Mustang Trails Park totals 2.3-acres with a creek running through the park. NDM developed construction plans for the structural stabilization of multiple areas along Farmers Branch Creek after a hydraulic analysis was completed to identify the existing erosive conditions and determined the hydraulic impacts of proposed improvements. The tied back gabion walls ranged from 9-feet to 24-feet in height and were designed to not only stabilize the existing slopes but also protect the existing franchise and local utilities. The slopes are immediately adjacent to Valley View Lane so live loads from traffic were considered as a part of the design.