DWU Walcrest Pump Station and Reservoir Rehabilitation

  Dallas, Texas

DWU Walcrest Pump Station/Reservoir Rehabilitation   |   Dallas / Fort Worth

View Next Project >>


NDM was the prime consultant for the analysis and design of an 85 MGD pump station and replacement of a 20 MG below grade reservoir. The overall project included the development of system head curves, design of pump station with horizontal split-case pumps, design of two 10 MG reservoir cells, evaluation of internal reservoir circulation, addition of a reservoir overflow, yard piping and valves, coordination and approvals from TCEQ, reservoir assessment, zoning and platting, stakeholder and public meetings, and utility modifications. The NDM Survey Department established horizontal and vertical control, performed deed research and sketch of properties, prepared boundary for platting purposes, prepared topographic survey for design purposes and obtained location and elevations of geotechnical bores. Tasks included preparation of a preliminary plat and final plat.